04Completion & handover
Final Survey and Report for Occupation Certificate
A final survey confirms the finished building is where the approval says, at the approved heights. The signed report gives your certifier the setbacks, floor levels and heights needed for the occupation certificate.
When you need it
Is this the survey you need?
- The building is finished and the certifier asks for a final survey
- Your consent requires floor levels or height to be confirmed by a surveyor
- A flood-affected site needs the floor level confirmed on AHD
- Before strata or Torrens subdivision of a finished duplex
- A buyer or lender wants the new house checked against the boundaries
What's included
What we survey and show
- Boundaries confirmed by survey
- Building location and setbacks to each boundary
- Finished floor levels on AHD
- Ridge and wall heights against the approved maximum
- Eaves, gutters and other projections near the boundaries
- Pools, garages and outbuildings where required
- Any encroachment onto neighbouring land or easements
- Signed report comparing the results with the approved plans
Good to know
What the certifier looks for
Before issuing the occupation certificate, the certifier needs to be satisfied the building matches the approval. Setbacks, floor levels and building height are among the measurements most often covered by consent conditions, because they affect neighbours, flooding and the streetscape. The final survey measures each one and reports it against the approved plans. If something is outside the approval, you find out with exact figures, which makes it easier to resolve with the certifier.
Building on earlier checks
If we set out the building and checked the slab and frame, the final survey closes the loop. The same boundaries and benchmark are used from start to finish, so the figures in the final report line up with the checks the builder already has. On a duplex, the final survey can also feed into the strata or Torrens subdivision plan, which can save a separate visit.
How it works
From quote to signed plan
- CH 0.00
Send the approval
The approved plans and any consent or certifier conditions that mention survey.
- CH 25.00
Field survey
Boundaries, setbacks, floor levels and heights are measured.
- CH 50.00
Compare
The results are compared with the approved plans.
- CH 75.00
Signed report
You receive a signed report and plan for the certifier.
What you get
Delivered to you
- Signed survey report
- Signed PDF plan
- Levels on AHD
Checked and signed by Taha Abdo, Registered Surveyor SU010105.
Who it's for
We send the files to you, or straight to your architect, builder, engineer or certifier.
- Builders
- Homeowners
- Certifiers & engineers
Questions
Common questions
Is a final survey the same as an identification survey?
They are similar, as both check buildings against the boundaries. A final survey also checks floor levels and heights against the approved plans, because that is what the certifier needs for the occupation certificate.
What if the building is outside the approved setback?
The report states the measured setback. Small differences may be accepted by the certifier, while larger ones may need the consent to be modified. Getting exact figures early gives you the most options.
What do you need from me?
The approved plans, the consent conditions that mention survey, and any checklist from your certifier. We also need access to the site and, for floor levels, inside the building at an agreed time.
Related services
Get a quote
Send us the address.
We come back with a fixed fee that lists exactly what is included. Not sure which survey you need? Tell us what you are building.