02Subdivision & approvals
Dual Occupancy Surveys, Start to Finish
A duplex needs several surveys over its life, from the first detail survey to the subdivision plan. Using one surveyor for all of them keeps the levels, boundaries and records consistent throughout.
When you need it
Is this the survey you need?
- Planning a duplex on a single lot
- Your designer needs a survey to start the DA or CDC drawings
- The builder is ready for set out and level checks
- The build is finished and the certifier wants a final survey
- You want separate titles to sell or refinance each dwelling
What's included
What we survey and show
- Detail and level survey, with boundaries identified
- Preliminary subdivision or strata plan for the DA
- Building set out and stormwater set out
- Formwork, slab and first-floor level checks
- WAE survey of stormwater and OSD
- Final survey for the occupation certificate
- Torrens plan of subdivision or strata plan, with the 88B instrument
- Lodgement with NSW LRS
Good to know
Torrens or strata?
A duplex can be split into two Torrens lots, each owning its own land, or into a strata scheme with two lots and common property. The right choice depends on council's controls, the lot sizes and how the dwellings are built, for example whether they share a wall. Your town planner or designer can advise on what council will allow. On the survey side, we explain what each option involves, so you can decide with the full picture.
Why one surveyor helps
Each survey on a duplex builds on the one before. The benchmark from the detail survey is used again for the set out, the slab check and the final survey. The boundaries marked at the start are the ones shown on the subdivision plan. When one surveyor handles every stage, nothing has to be re-established from scratch, and questions from the builder or certifier go straight to the person who did the work.
How it works
From quote to signed plan
- CH 0.00
Before design
Detail and level survey with boundaries, then a preliminary plan for the DA.
- CH 25.00
During construction
Set out, stormwater set out and level checks as the builder needs them.
- CH 50.00
Completion
WAE and final surveys for the engineer and the occupation certificate.
- CH 75.00
New titles
Torrens or strata plan prepared and lodged with NSW LRS.
What you get
Delivered to you
- Signed PDF plans
- DWG (CAD)
- Torrens or strata plan
- Lodgement with NSW LRS
Checked and signed by Taha Abdo, Registered Surveyor SU010105.
Who it's for
We send the files to you, or straight to your architect, builder, engineer or certifier.
- Homeowners
- Builders
- Developers
- Architects & designers
Questions
Common questions
When should I think about the subdivision?
From the start. The preliminary plan goes in with the DA, and the final plan follows once the consent conditions allow it. For strata, the building is usually finished first, because the plan defines the lots by the completed building.
Can I book only some of the surveys?
Yes. Each survey is quoted on its own, so you book only what you need. Many clients start with the detail survey and add the later stages as the project moves along.
Who arranges the certifier?
You do, or your builder or project manager. The certifier issues the construction and occupation certificates, and council or a registered certifier issues the subdivision or strata certificate. We provide the survey documents each of them needs.
What drawings do you need for the set out?
The current construction drawings: architectural, structural and stormwater. We check they agree with each other and with the boundaries before going on site, and raise anything that does not add up.
Get a quote
Send us the address.
We come back with a fixed fee that lists exactly what is included. Not sure which survey you need? Tell us what you are building.